SourcingAI

Plastic shaker bottle mould

I have found results from2000+products and700+suppliers aboutPlastic shaker bottle mould

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Shaping Mode: Injection Mould
Application: Car
Certification: CE
Customized: Customized
Material: Plastic
Suitable for: Universal
Usage: Decoration
Style: Business
Surface Finish Process: Polishing
Mould Cavity: Single Cavity
Process Combination Type: Compound Die
Runner: Cold Runner
Design Software: UG
Installation: Fixed
Standard: DME
Plastic Material: ABS
Plastic Type: Thermosoftening Plastic
Plastic Form: Liquid
Molding Method: Injection Molding
Runner System: Hot Runner
Cavity Quantity: 32
Power Source: Manpower
Application: Household Appliances
Application: Commodity
Application: Electronic
Application: Home Use
Application: Hardware
Application: Furniture
Certification: FDA
Certification: ISO
Certification: RoHS
Certification: CCC
Material: Steel
Usage: Gift
Surface Finish Process: Heat Treatment
Mould Cavity: Multi Cavity
Process Combination Type: Single-Process Mode
Process Combination Type: Progressive Die
Runner: Hot Runner
Design Software: AutoCAD
Installation: Semi Fixed
Standard: HASCO
Plastic Material: PE
Cavity Quantity: 8

Sourcing guidance for Plastic Shaker Bottle Mould

What are the key technical specifications to consider when selecting a Plastic Shaker Bottle Mould?

When sourcing a high-quality mould, you must prioritize steel grade selection (such as S136, 718H, or P20) to ensure corrosion resistance and durability. The mould life should be guaranteed for at least 500,000 to 1,000,000 shots for mass production. Additionally, ensure the design includes a high-efficiency cooling system to reduce cycle times and a hot runner system (like Yudo or Husky) to minimize material waste and improve surface finish.

How can I ensure the mould produces leak-proof and BPA-free shaker bottles?

The mould design must feature high-precision CNC machining to ensure the threading and sealing grooves are airtight. You should require the supplier to perform a Moldflow analysis to prevent air traps or weld lines that could cause leaks. Furthermore, verify that the mould is compatible with food-grade materials like PP, PE, or Tritan, and request FDA or LFGB compliance certificates for the final product samples.

What customization capabilities should a professional mould manufacturer offer?

A top-tier manufacturer should provide OEM/ODM services, including 3D prototyping and CAD/UG design support. Look for suppliers who can integrate interchangeable inserts for different logo embossments or scale markings. They should also offer multi-cavity designs (e.g., 2-cavity or 4-cavity) to balance production speed with machine tonnage requirements.

What are the standard quality inspection procedures for injection moulds?

Before shipment, the supplier must conduct a T1 trial run and provide a mould testing video and sample dimension report. Key inspections include wall thickness uniformity, flash checking, and ejection stability. Ensure the supplier performs a 24-hour dry run to verify the mechanical movements and the automatic de-moulding process.

Cross-Border Procurement Risks and Strategies for Industrial Moulds

How can I mitigate the risk of receiving a mould that does not match my machine specifications?

Always provide your injection molding machine's technical parameters, including tie-bar spacing, maximum opening stroke, and ejector rod layout. Request the supplier to provide a mould assembly drawing for your approval before steel cutting. For secure sourcing, use Made-in-China.com's Secured Trading Service to ensure payment is only released after technical milestones are met.

What are the best practices for negotiating price and lead time with Chinese mould suppliers?

Do not just focus on the lowest price; a cheap mould often uses recycled steel or poor heat treatment, leading to premature failure. Negotiate a staged payment plan (e.g., 40% deposit, 30% after T1 sample approval, 30% before shipment). Standard lead times for shaker bottle moulds are 35 to 50 days; be wary of suppliers promising significantly shorter times as they may skip critical aging treatments for the steel.

What shipping and packaging precautions are necessary for heavy industrial moulds?

Moulds are susceptible to rust during sea freight. Insist that the supplier applies anti-rust oil, wraps the mould in vacuum-sealed plastic, and uses a fumigated wooden box reinforced with iron straps. Ensure the mould identification plate and spare parts list (springs, ejector pins, O-rings) are clearly attached and included in the shipment.

How do I handle intellectual property (IP) protection when sharing designs?

Before sharing detailed 3D files, sign a Non-Disclosure Agreement (NDA). Choose reputable suppliers on Made-in-China.com who have Audited Supplier status, as these companies are more likely to value long-term reputation over IP theft. Clearly state in the contract that the ownership of the mould and design remains with the buyer.

Related queries