SourcingAI

Dga

I have found results from1000+products and600+suppliers aboutDga

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Strength Testing Machine
Universal Testing Machine
Synthesis Material Intermediates
Laser Gas Analyzer
Electrochemical Gas Analyzer
Type: Transformer Tester
Grade Standard: Medicine Grade
Appearance: Liquid
Certification: BP
Loading Method: Dynamic Load
Display: Digital
Control: Manual Control
Power Source: AC220V
Max Diameter of Workpiece: <500mm
Mass Scope of Workpiece: <900kg
Maxcapacity: <1000KN
Accuracy Grade: 0.5
Load Way: Electronic Load
Weight: 100-500Kg
Oil Cylinder Position: Under
Protection: Shock Resistance
Application: Power
Phase: Three
Core: Core-type Transformer
Oil-immersed Type Transformer
Winding Type: Two-winding Transformer
Usage: Power Transformer
Frequency Characteristics: Low Frequency
Shape of Core: Ring
Gaspath System: Single
Detector: TCD
Stationary Phase: Solid Adsorbent
Mobile Phase: Liquid
Chromatography Type: Gas Chromatography
Convetional Analytical Column
The Analysis of Environmental Samples
Gamma Ray Spectrometer
Energy Resolution: ≤7%
Spectrometer Detector: SDD
Chromatographic Column Length: 10~30cm
Chromatographic Column Diameter: 20~40mm
Portable: Portable
Quality: Industrial
Colour: Colorless
Customized: Customized
Gas: CO
Max.Capacity: >400 L/min
Pressure Medium: Gas
Environment: Room Temperature
Warranty: With Warranty
Installation: Portable Precise
Grade Standard: Electron Grade
Grade Standard: Industrial Grade
Grade Standard: Agriculture Grade
Certification: USP
Certification: GMP
Certification: ISO
Certification: HSE
Certification: ISO9001
Certification: ISO9001-2000
Certification: CE
Certification: IEC
Certification: FCC
Certification: RoHS
Loading Method: Static Load
Display: Needle
Control: Computer Control
Power Source: AC380V
Power Source: AC 85V-265V
Max Diameter of Workpiece: 900mm
Mass Scope of Workpiece: 900kg
Maxcapacity: >1000KN
Accuracy Grade: 1
Weight: 0-100Kg
Application: Electronic
Usage: Distribution Transformer
Gaspath System: Three
Mobile Phase: Gas
Appliance: Biochemistry
Portable: Non Portable
Customized: Non-Customized

Sourcing guidance for Dga

What are the key technical specifications to consider when sourcing DGA equipment for power transformers?

When selecting DGA (Dissolved Gas Analysis) monitors, you must prioritize detection accuracy and sensitivity (ppm levels) for key fault gases like Hydrogen (H2), Acetylene (C2H2), and Methane (CH4). Ensure the device utilizes Photoacoustic Spectroscopy (PAS) or Gas Chromatography (GC) for high-precision laboratory-grade results. Additionally, verify the measurement range and repeatability to ensure the equipment can detect early-stage insulation degradation effectively.

Which international compliance standards are mandatory for DGA monitoring systems?

Professional DGA equipment must adhere to IEC 60567 for sampling and analysis of free gases and ASTM D3612 for the analysis of gases dissolved in electrical insulating oil. For electronic components and communication, ensure the device supports IEC 61850 protocols for seamless integration into substation automation systems, and carries CE or UL certification for electrical safety and electromagnetic compatibility (EMC).

How does the installation environment affect the choice of DGA hardware?

Since DGA units are often installed outdoors on transformers, they must have an IP66 or higher ingress protection rating to withstand harsh weather. Consider the operating temperature range (typically -40°C to +70°C) and ensure the unit includes built-in thermal regulation to maintain gas extraction efficiency in extreme climates. For remote sites, prioritize models with integrated 4G/5G or satellite communication capabilities.

What are the maintenance requirements for online DGA monitors?

Buyers should evaluate the calibration interval and the need for carrier gases. Modern 'maintenance-free' units using PAS technology are often preferred as they do not require frequent gas cylinder replacements. However, you should still confirm the lifespan of the infrared source or sensors and ensure the supplier provides remote diagnostic software to minimize on-site technician visits.

Cross-Border Procurement & Risk Management for DGA Systems

How can I verify the technical credibility of a DGA supplier on Made-in-China.com?

Request Type Test Reports from independent third-party laboratories (such as KEMA or CNAS-accredited labs). Check if the supplier is a 'Diamond Member' or 'Audited Supplier' on Made-in-China.com, which indicates a higher level of business verification. Always ask for case studies or reference lists of utility companies that have successfully deployed their equipment in the field.

What are the primary risks in shipping sensitive DGA analytical instruments internationally?

DGA equipment contains high-precision optical and electronic components sensitive to vibration and humidity. Ensure the contract specifies vacuum-sealed anti-static packaging and shock-absorbent wooden crates. It is highly recommended to use impact indicators (e.g., ShockWatch labels) on the packaging to monitor handling during transit and to facilitate insurance claims if damage occurs.

What negotiation strategies should be used for high-value DGA bulk orders?

Focus on the Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for extended warranties (3-5 years), inclusive software license updates, and on-site commissioning support. For large-scale grid projects, request a tiered pricing structure where the unit cost decreases as the volume of monitoring points increases.

How can I ensure transaction security for large-scale industrial equipment purchases?

Utilize Secured Trading Services offered by Made-in-China.com to protect your payment until the goods are shipped. For high-value DGA systems, use a Letter of Credit (L/C) or a staged payment plan: 30% deposit, 60% after successful Factory Acceptance Testing (FAT), and 10% after Site Acceptance Testing (SAT) to ensure the equipment meets all functional requirements before final payment.

Related queries