SourcingAI

110kv gis

I have found results from3000+products and900+suppliers about110kv gis

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: High-voltage
Strength Testing Machine
Structure: Three-column Disconnector
Installation: Outdoor High-voltage
Operation: Manual
Grounding Mode: Not Grounding
Movement Mode: Oscillating Type
Number of Poles: Three Pole
Grounding: Un Grounded
Series: Three
Run: Swing
Switching Mode: Double-Throw Type
Common Model: SR
Structure of Operating: Manual
Certification: ISO
Max Diameter of Workpiece: 900mm
Mass Scope of Workpiece: <900kg
Maxcapacity: <1000KN
Accuracy Grade: 0.5
Load Way: Electronic Load
Loading Method: Static Load
Control: Computer Control
Weight: 0-100Kg
Power Source: AC380V
Oil Cylinder Position: Under
Operation: Electric
Grounding Mode: Grounding
Vertical Rotary Type
Number of Poles: Unipolar
Grounding: Single Ground
Series: Single-Stage
Run: Vertical Rotation
Switching Mode: Single Throw-in
Certification: GS
Certification: RoHS
Certification: CE
Certification: IS9001
Certification: ISO9001

Sourcing guidance for 110kv Gis

What are the key technical specifications to evaluate when sourcing 110kv GIS?

When procuring 110kv GIS, you must prioritize Rated Voltage (110kV-126kV), Rated Current (typically 1250A to 3150A), and Short-circuit Breaking Capacity (31.5kA to 40kA). Ensure the equipment uses SF6 gas with a guaranteed annual leakage rate of <0.5%. Additionally, verify the Mechanical Endurance Class (M2) to ensure the circuit breaker can handle at least 10,000 operations without maintenance.

Which international compliance standards are mandatory for 110kv GIS?

The equipment must strictly adhere to IEC 62271-203 (High-voltage switchgear and controlgear – Part 203: Gas-insulated metal-enclosed switchgear for rated voltages above 52 kV). For specific markets, ensure compliance with IEEE C37.122 or local grid standards. Suppliers should provide Type Test Reports from accredited third-party laboratories like KEMA, CESI, or TUV to prove performance under extreme conditions.

What are the primary usage scenarios and environmental considerations for 110kv GIS?

GIS is ideal for urban substations with limited space, coastal areas with high salinity, and industrial zones with heavy pollution due to its compact, metal-enclosed design. If the installation site is at a high altitude (>1000m) or in extreme cold (<-30°C), you must specify requirements for external insulation creepage distance and SF6/N2 mixed gas or heating elements to prevent gas liquefaction.

How can a buyer ensure the long-term reliability and maintenance of the GIS system?

Request the integration of Online Monitoring Systems for Partial Discharge (PD) and SF6 Gas Density/Moisture. These technologies allow for predictive maintenance, significantly reducing the risk of catastrophic failure. Ensure the supplier provides a comprehensive O&M manual and guarantees the availability of spare parts (sealing rings, adsorbents, and coils) for at least 20 years.

Cross-Border Procurement Risks and Strategic Advice for 110kv GIS

How should buyers manage the risks associated with shipping and handling high-voltage GIS?

GIS units are precision instruments sensitive to vibration. You must require Impact Recorders to be installed on the crates during transit. Use Vacuum Packaging with desiccant for all sensitive components. For shipping to your specific country, utilize Professional Heavy-Lift Logistics and ensure the Incoterms are clearly defined, preferably CIF or DAP, to ensure the supplier manages the risk until the goods reach a controlled environment.

What are the best strategies for negotiating with 110kv GIS suppliers on Made-in-China.com?

Focus negotiations on the Total Cost of Ownership (TCO) rather than just the initial purchase price. Demand a Warranty Period of 24-36 months post-commissioning. On Made-in-China.com, prioritize Audited Suppliers with 'Gold' status and request a Factory Audit (Virtual or Third-Party) to verify their high-voltage laboratory capabilities and clean-room assembly standards.

What transaction security tips are essential for high-value electrical equipment orders?

Given the high transaction value, use Letter of Credit (L/C) or Escrow-based payment terms linked to project milestones (e.g., 30% deposit, 40% after successful Factory Acceptance Test (FAT), 20% upon arrival, and 10% after commissioning). Never release the final payment until the Site Acceptance Test (SAT) is completed and the equipment is energized successfully.

How do international trade policies and environmental regulations affect GIS procurement?

Be aware of the Global Warming Potential (GWP) of SF6 gas. Some regions are implementing Carbon Taxes or phase-out schedules for SF6. Check if your country requires Import Licenses for Pressure Vessels (as GIS compartments are pressurized). Ensure the supplier provides a Certificate of Origin to benefit from potential Free Trade Agreements (FTA) which can reduce import duties by 5-15%.

Related queries