SourcingAI

King power generator

I have found results from8000+products and2000+suppliers aboutKing power generator

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Micro-Computer Control Automatic Diesel Generator
Basic Diesel Generator
Self-Starting Diesel Generator
Installation Method: Fixed
Stroke: Four Stroke
Cooling Method: Water Cooling
AC Three Phase
Speed: Speed
Conditions of Use: Trailer Type
Usage: Common Units
Low Noise Automation Type
AC Rotating Exciter
Phase: Single-Phase
Standard: Standard
Starting: Electric Start
Power: <5kW
Gas Source: Gas
Certification: CE
Installation Method: Portable
Stroke: Six Stroke
Stroke: Two Stroke
Cooling Method: Air Cooled
Cooling Method: Wind Cooling
AC Single Phase
Speed: 1500rpm
Speed: 1800rpm
Conditions of Use: Land Use
Conditions of Use: Car Type
Usage: Standby Unit
Usage: Emergency Crew
Landuse Type of Unit: Automation Type
Landuse Type of Unit: Low Noise
Landuse Type of Unit: Ordinary
Excitation Mode: Static Exciter
Standard: Nonstandard
Starting: Hand Start
Power: >200kW
Power: 50-200kW
Power: <50kW
Gas Source: Natural Gas
Certification: ISO
Certification: TLC

Sourcing guidance for King Power Generator

What are the key technical specifications to consider when selecting a King Power Generator?

When sourcing industrial-grade generators, you must prioritize the Power Output (kVA/kW) to ensure it meets both Prime Power and Standby Power requirements. Key components to verify include the alternator brand (e.g., Stamford, Leroy Somer) and the engine cooling system, which should be designed for high-ambient temperatures. Additionally, ensure the unit features a digital control panel (like Deep Sea or ComAp) for real-time monitoring of voltage, frequency, and oil pressure.

Which international compliance standards are mandatory for King Power Generators?

For global trade, generators must adhere to ISO 8528 for reciprocating internal combustion engine-driven alternating current generating sets. Depending on the destination market, you should verify CE Certification for Europe, EPA/Tier 4 emissions standards for the USA, and SONCAP for African markets. Ensure the supplier provides Noise Level Certification (LWA) if the unit is intended for residential or hospital use.

How can I evaluate the fuel efficiency and operational longevity of these units?

Request a Fuel Consumption Map at 50%, 75%, and 100% load. High-quality King Power units typically utilize electronic speed governors to optimize fuel injection. For longevity, confirm the use of 100% copper wiring in the alternator and a heavy-duty base frame with anti-vibration mountings. Ask for the Mean Time Between Failures (MTBF) data to assess long-term reliability.

Cross-Border Procurement Strategy for Power Equipment

What are the primary risks when importing heavy machinery like generators?

The main risks include damage during maritime transit and non-compliance with local grid codes. To mitigate this, insist on Seaworthy Packaging (vacuum plastic wrapping + reinforced wooden crates) and purchase Comprehensive Marine Insurance. Always verify that the voltage and frequency (e.g., 50Hz vs 60Hz) are customized to your specific country's national grid requirements before production.

How should I negotiate with suppliers on Made-in-China.com for the best value?

Focus on the Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for spare parts kits (filters, belts, gaskets) to be included for the first 1,000 hours of operation. For bulk orders, aim for a 10-15% discount or request an extended engine warranty (e.g., 2 years or 2,000 hours). Use the Audit Reports available on Made-in-China.com to verify the manufacturer's production capacity and factory scale.

What logistics and payment security measures are recommended?

Due to the high value of generators, use Secured Trading Services or Letter of Credit (L/C) to ensure payment is only released upon verification of shipping documents. For shipping, FOB (Free On Board) is recommended if you have a reliable forwarder, but for heavy equipment, CIF (Cost, Insurance, and Freight) can simplify the process. Ensure the supplier provides a Pre-shipment Inspection (PSI) report and a Load Test Video showing the generator running at full capacity.

Related queries